Sector

Energy

Client

Zeal Hotels

Location

Exeter

Tags

Design & delivery

W0945 PlanningScene 3

Westworks is appointed on this EfW project near Hull, the project will form the centre of a wider waste processing area which has already been bringing up its green credentials with the addition of wind turbines.

Working closely with Paul Winter Consulting, this scheme has been redesigned for a modern equipment layout and has been successfully taken through a planning process.  Detailed design is underway, and the project will be carefully designed with the site operations in considered as the primary focus.

The project houses different processing arrangements in a collection of buildings, these buildings are carefully orchestrated and linked to optimise the energy production workflow.  The approach also contains operational noise, dust etc, presenting a clean design to the local environment.

W0945 PlanningScene 11_1